FAQs
Earlier is better. We provide pre-construction input on constructability, phasing, and budgets so your architect can design with real numbers and lead times.
Open-book estimating with a detailed schedule of values, clearly defined allowances, and a written change-order protocol. You’ll see alternates and value-engineering options before decisions.
We do. We assist in all permitting requirements—submittals, comment tracking, and coordination for planning, building, coastal/wildfire, and HOA or historical boards.
We are licensed, insured, and bonded building contractors. We provide certificates naming the owner as additional insured and can arrange project-specific bonding when required.
Yes. We maintain numerous local references and, when privacy allows, arrange private walk-throughs of recent work.
Upfront geotechnical coordination, shoring/drainage plans, fire-hardening details, and logistics for access, staging, and neighborhood impact—documented before groundbreak.
Layered QA/QC: submittals, mockups, third-party testing where appropriate, and pre-cover inspections with photo logs so what’s behind the walls meets the same standard as what’s visible.
We publish a procurement schedule, place critical orders early, carry approved alternates, and resequence non-dependent work to protect the timeline.
One point of accountability. We run RFIs, track decisions, schedule onsite reviews, and manage sample approvals so design intent is preserved through execution.
A homeowner’s manual, a vetted list of local pros, and optional maintenance plans—ongoing care to protect systems, finishes, and long-term value.